Boathouse Construction Update (June 7)

Copper piping is visible in the room framing now present throughout the back end of the boathouse.

Copper piping is visible in the room framing now present throughout the back end of the boathouse.

June 7, 2013

HADLEY, Mass. - The crews working on the UMass Boathouse construction project have started the framing for the rooms in the back of the building and second floor loft. The layout of the interior is beginning to take shape as the construction team models the lower level and second floor loft.

Take a closer look on the newest additions to the project through a photo gallery here.

 

 

GET YOUR OFFICIAL
UMASS GEAR HERE

    Event Calendar

    Saturday, May 2
    vs Atlantic 10 Championships All Day
    Friday, May 8
    vs Dad Vail Regatta Day One All Day
    Saturday, May 9
    vs Dad Vail Regatta Day Two All Day
    Friday, May 29
    vs NCAA Championship Heats All Day
    Saturday, May 30
    vs NCAA Championship Heats All Day
    Sunday, May 31
    vs NCAA Championship Finals All Day
    Twitter
    • Loading Tweets...
      1 second ago